Posted on December 22, 2016 by Mike
IMG_3748

This gallery contains 6 photos.

The end is insight! The crew has spent the last several days installing drywall. One of the side effects of installing drywall is that mud puts a lot of moisture into the house. As a result of how tight the … Continue reading →

Posted in Building Envelope, Interior | Tagged Air Sealing, Drywall, Energy Efficiency, interior walls, walls

Mini Splits and HRV

Gallery

Posted on December 22, 2016 by Mike
IMG_3638

This gallery contains 7 photos.

Over the past weekend I worked tirelessly to install ductwork for the HRV and the two mini split heads. The house will be heated and cooled solely with electricity using mini-split heat pumps. The mini-split has an indoor fan-unit called … Continue reading →

Posted in Energy Efficiency, HVAC | Tagged Energy Efficiency, Energy Star, HRV, Mini Split

Smart Home Wiring

Gallery

Posted on December 19, 2016 by Mike

I have spent a lot of time talking about the building science behind my project and very little about the smart home technology that I am packing into the house. Now that I have started running thousands (yes thousands!) of … Continue reading →

Posted in Electrical, Smart Home | Tagged Energy Efficiency, Smart Home, Wiring

A Front Door

Gallery

Posted on December 13, 2016 by Mike
IMG_3709

This gallery contains 6 photos.

My builder handed me a key today! The house is officially dried-in. All of the doors and locks are installed. One of the most incredible things is how warm and quiet the house stays. When you shut the massive Intus … Continue reading →

Posted in Building Envelope, Energy Efficiency, Exterior Doors, Windows | Tagged Doors, Energy Efficiency, Front Door, Intus, Windows

Interior Walls

Gallery

Posted on November 23, 2016 by Mike
IMG_3643

This gallery contains 3 photos.

The walls have been marked-out and the studs cut. The inside will soon be shaping-up!

Posted in Framing | Tagged interior walls, walls

Windows and WRB

Gallery

Posted on November 23, 2016 by Mike
IMG_3626

This gallery contains 6 photos.

The builder managed to dry-in the house just in-time for the first snow! Over the last couple weeks, the builder foamed all the joints in the SIPS, taped them, laid-down the Solitex Mento 1000 weather resistive barrier (WRB), put furring … Continue reading →

Posted in Building Envelope, Windows | Tagged Air Sealing, Windows, WRB

Site Infrastructure

Gallery

Posted on November 19, 2016 by Mike
IMG_3609

This gallery contains 9 photos.

The electrician laid the electric cable conduit and pulled the electric wire from the house to transformer. The house is situated about 500 feet off the road which dictated the need for the electric company to extend the primary line … Continue reading →

Posted in Electrical | Tagged Cable, Electrical

Structure Assembled!

Gallery

Posted on November 12, 2016 by Mike
IMG_3576

This gallery contains 9 photos.

The SIPS have gone together incredible quickly. In two weeks time, the walls have been erected, loft framed, beams set, and roof erected. Of course, because the house is constructed of SIPS, this also means at this point it is … Continue reading →

Posted in Building Envelope, Framing | Tagged Air Sealing, Design, SIPS, Structure

SIPS Arrive

Gallery

Posted on November 1, 2016 by Mike

The SIPS arrived last Wednesday. By the time I arrived on-site they were piled all over the place. As you can imagine, the panels to build an entire house take up quite a bit of room! As you may recall … Continue reading →

Posted in Building Envelope, Energy Efficiency, Framing | Tagged Air Sealing, Energy Star, SIPS, Structure

Septic System Installed

Gallery

Posted on November 1, 2016 by Mike
Septic System and House

This gallery contains 7 photos.

Since my last visit to the site, a lot has happened. One of the more obvious changes in the installation of the septic system. The excavator had to dig from the house to a 1500 gallon tank to the base … Continue reading →

Posted in Plumbing | Tagged Plumbing, Septic

Post navigation

← Older posts
Newer posts →

Recent Posts

  • Outdoor Patio Paradise
  • Rental Photos
  • Final Blower Door
  • Smart HRV
  • Humidity Challenges

Archives

  • July 2017 (1)
  • June 2017 (2)
  • May 2017 (2)
  • April 2017 (2)
  • March 2017 (2)
  • February 2017 (3)
  • January 2017 (7)
  • December 2016 (5)
  • November 2016 (6)
  • October 2016 (1)
  • September 2016 (4)
  • August 2016 (2)
  • July 2016 (2)
  • June 2016 (5)
  • May 2016 (4)
  • April 2016 (1)
  • March 2016 (6)

Categories

  • Affordability (11)
  • Building Envelope (15)
  • Design (16)
  • DIY (4)
  • Electrical (3)
  • Energy Efficiency (13)
  • Exterior Doors (2)
  • Foundation (3)
  • Framing (6)
  • HVAC (2)
  • Interior (7)
  • Kitchen and Bath (4)
  • Planning (5)
  • Plumbing (7)
  • Smart Home (2)
  • Suppliers & Partners (1)
  • Uncategorized (4)
  • Windows (6)
Proudly powered by WordPress